+59
Krepost
Airbornewolf
Scorpius
Mir
Autodestruct
Russian_Patriot_
ALAMO
lancelot
lyle6
limb
mnztr
Azi
owais.usmani
Rodion_Romanovic
hoom
Aristide
Arrow
The-thing-next-door
Big_Gazza
Tsavo Lion
SeigSoloyvov
Tingsay
dino00
Isos
Singular_Transform
Hole
marat
AlfaT8
miketheterrible
kvs
George1
TheArmenian
PapaDragon
ult
zg18
Singular_trafo
max steel
Backinblack
JohninMK
flamming_python
OminousSpudd
mutantsushi
franco
DTA
sepheronx
Kyo
Firebird
Mike E
bantugbro
Werewolf
magnumcromagnon
Asf
Viktor
Cyberspec
GarryB
TheRealist
TR1
medo
Austin
63 posters
Icebreakers
Isos- Posts : 11602
Points : 11570
Join date : 2015-11-06
- Post n°176
Re: Icebreakers
Just saw that they need only 2-3 years to build one of them. That's a very good news.
PapaDragon- Posts : 13472
Points : 13512
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°177
Re: Icebreakers
Isos wrote:Just saw that they need only 2-3 years to build one of them. That's a very good news.
And they will be built at Zvezda which means that current shipyard in St. Pete will be free to take more orders for Arktika-class if they need some extras
miketheterrible- Posts : 7383
Points : 7341
Join date : 2016-11-06
- Post n°178
Re: Icebreakers
Isos wrote:Just saw that they need only 2-3 years to build one of them. That's a very good news.
Benefits of having state of the art, brand new shipyard.
PapaDragon- Posts : 13472
Points : 13512
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°179
Re: Icebreakers
Fresh photo:
https://sdelanounas.ru/blogs/113450/
Hole- Posts : 11121
Points : 11099
Join date : 2018-03-24
Age : 48
Location : Scholzistan
- Post n°180
Re: Icebreakers
Serbia should order one to keep the Danube clear.
PapaDragon- Posts : 13472
Points : 13512
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°181
Re: Icebreakers
Hole wrote:Serbia should order one to keep the Danube clear.
Yeah we could definitely use something new though not nuclear
That winter from couple of years back was too close for comfort
George1- Posts : 18520
Points : 19025
Join date : 2011-12-22
Location : Greece
- Post n°182
Re: Icebreakers
The first reactor of the floating nuclear power unit "Akademik Lomonosov" was launched
https://bmpd.livejournal.com/3402899.html
https://bmpd.livejournal.com/3402899.html
PapaDragon- Posts : 13472
Points : 13512
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°183
Re: Icebreakers
George1 wrote:The first reactor of the floating nuclear power unit "Akademik Lomonosov" was launched
https://ic.pics.livejournal.com/bmpd/38024980/6110144/6110144_original.jpg
https://bmpd.livejournal.com/3402899.html
George, this thing ain't no icebreaker, it's a powerplant. I posted it in Nuclear Industry tread
ALSO:
Replacement for Viktor Chernomirdin Icebreaker is being designed since that class has been problematic and will not be built any further.
Name is LK-40 and it's supposed to be able to use both diesel and LNG:
http://tehnoomsk.ru/node/3398
Hole- Posts : 11121
Points : 11099
Join date : 2018-03-24
Age : 48
Location : Scholzistan
- Post n°184
Re: Icebreakers
dino00- Posts : 1677
Points : 1714
Join date : 2012-10-12
Age : 37
Location : portugal
- Post n°185
Re: Icebreakers
Project 22220
The order for the construction of icebreakers at Baltzavod will be expanded from three to five
Rosatom is the customer
MOSCOW, November 23. / Tass /. The order for construction of an icebreaker at the Baltic plant for the development of the Arctic region will be expanded from three to five vessels, Deputy Prime Minister Yury Borisov told reporters on Friday.
“The President has set tasks for the development of the Arctic region, for this purpose an icebreaker fleet is being formed and reconstructed. Today, three 60 MW icebreakers are under construction at the Baltic Shipyard. Soon this order will be expanded to five [icebreakers],” said Borisov.
According to him, the only executor for the construction of a new icebreaker "Leader", and there are three such ships to be built, will be the Zvezda plant in the Far East. The customer of these icebreakers is Rosatom.
The Deputy Prime Minister noted that the production capabilities of Zvezda are focused on large-capacity shipbuilding. “The presence of this icebreaking fleet will ensure the volume of cargo turnover that the president is setting for us - reaching about 120 million tons per year,” added Borisov.
Earlier, the head of the United Shipbuilding Corporation announced plans to conclude before the end of this year a contract to build two universal nuclear icebreakers of the project 22220 in addition to the three already under construction.
https://tass.ru/ekonomika/5825547
The order for the construction of icebreakers at Baltzavod will be expanded from three to five
Rosatom is the customer
MOSCOW, November 23. / Tass /. The order for construction of an icebreaker at the Baltic plant for the development of the Arctic region will be expanded from three to five vessels, Deputy Prime Minister Yury Borisov told reporters on Friday.
“The President has set tasks for the development of the Arctic region, for this purpose an icebreaker fleet is being formed and reconstructed. Today, three 60 MW icebreakers are under construction at the Baltic Shipyard. Soon this order will be expanded to five [icebreakers],” said Borisov.
According to him, the only executor for the construction of a new icebreaker "Leader", and there are three such ships to be built, will be the Zvezda plant in the Far East. The customer of these icebreakers is Rosatom.
The Deputy Prime Minister noted that the production capabilities of Zvezda are focused on large-capacity shipbuilding. “The presence of this icebreaking fleet will ensure the volume of cargo turnover that the president is setting for us - reaching about 120 million tons per year,” added Borisov.
Earlier, the head of the United Shipbuilding Corporation announced plans to conclude before the end of this year a contract to build two universal nuclear icebreakers of the project 22220 in addition to the three already under construction.
https://tass.ru/ekonomika/5825547
PapaDragon- Posts : 13472
Points : 13512
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°186
Re: Icebreakers
dino00 wrote:Project 22220
The order for the construction of icebreakers at Baltzavod will be expanded from three to five
.........
“The President has set tasks for the development of the Arctic region, for this purpose an icebreaker fleet is being formed and reconstructed. Today, three 60 MW icebreakers are under construction at the Baltic Shipyard. Soon this order will be expanded to five [icebreakers],” said Borisov.
According to him, the only executor for the construction of a new icebreaker "Leader", and there are three such ships to be built, will be the Zvezda plant in the Far East. The customer of these icebreakers is Rosatom.
........
OH YEAH BABY, BEST NEWS ALL WEEK HELL, WHOLE MONTH!!!
So 2 more Arktika-class AND 3 (three!!!) Lider-class icebreakers, this will be sight to behold.
This is me upon hearing this news:
https://preview.redd.it/7v5nrhjf26y11.png?width=640&crop=smart&auto=webp&s=344c793403b22c5b05b2a1d6659d21d7fbf7214f
So any guesses on names? Kamchatka and Volga are next two largest things on the list.
As for Liders they should go with Asia, Europe and Antarctica.
Also:
dino00 wrote:...Rosatom is the customer...
Well obviously, I sure as hell don't expect Greenpeace to order some...
Tingsay- Posts : 183
Points : 185
Join date : 2016-12-09
- Post n°187
Re: Icebreakers
[quote="PapaDragon"]
You're a weeb?
Great news! Lider is gonna be handsome ship.
dino00 wrote:Project 22220
This is me upon hearing this news:
https://preview.redd.it/7v5nrhjf26y11.png?width=640&crop=smart&auto=webp&s=344c793403b22c5b05b2a1d6659d21d7fbf7214f
You're a weeb?
Great news! Lider is gonna be handsome ship.
Hole- Posts : 11121
Points : 11099
Join date : 2018-03-24
Age : 48
Location : Scholzistan
- Post n°188
Re: Icebreakers
It also means that Zvezda will be capable of installing nuclear reactors on ships.
Isos- Posts : 11602
Points : 11570
Join date : 2015-11-06
https://mobile.twitter.com/iren_maxx/status/1067502200669253634
A fire started during construction of an icebreaker I think in russian shipyard.
A fire started during construction of an icebreaker I think in russian shipyard.
Tingsay- Posts : 183
Points : 185
Join date : 2016-12-09
- Post n°190
Re: Icebreakers
Chernomyrdin caught fire
What an embarassing year for Russian Navy this year is.
http://www.thedrive.com/the-war-zone/25156/russian-icebreaker-under-construction-bursts-into-flames-injuring-at-least-two
What an embarassing year for Russian Navy this year is.
http://www.thedrive.com/the-war-zone/25156/russian-icebreaker-under-construction-bursts-into-flames-injuring-at-least-two
miketheterrible- Posts : 7383
Points : 7341
Join date : 2016-11-06
- Post n°191
Re: Icebreakers
Tingsay wrote:Chernomyrdin caught fire
What an embarassing year for Russian Navy this year is.
http://www.thedrive.com/the-war-zone/25156/russian-icebreaker-under-construction-bursts-into-flames-injuring-at-least-two
I Don't believe this belongs to the Russian navy... As well, it was a minimul damage ($20,000 damage) and now they will have to speed up repair now after the fire caught. 1 guy sent to hospital, other guy refused and just got checked up on site.
Making a mountain out of a mole hill.
http://tass.com/economy/1033232
Tingsay- Posts : 183
Points : 185
Join date : 2016-12-09
- Post n°192
Re: Icebreakers
miketheterrible wrote:
I Don't believe this belongs to the Russian navy... As well, it was a minimul damage ($20,000 damage) and now they will have to speed up repair now after the fire caught. 1 guy sent to hospital, other guy refused and just got checked up on site.
Making a mountain out of a mole hill.
http://tass.com/economy/1033232
This incident alone is not big ofcourse. But the combination of the 2 earlier fires this year, the PD-50 and Kuz incident, the breaking down of one Karakurt and now this, makes the year a very bad one.
SeigSoloyvov- Posts : 3900
Points : 3878
Join date : 2016-04-08
- Post n°193
Re: Icebreakers
Isos wrote:https://mobile.twitter.com/iren_maxx/status/1067502200669253634
A fire started during construction of an icebreaker I think in russian shipyard.
That's the Viktor Chernomyrdin
Looks like they had a spark and it blew, it could have been worse. They handled it fairly well in this case.
PapaDragon- Posts : 13472
Points : 13512
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°194
Re: Icebreakers
Usual slacking off on fire safety.
Pay cut and boot up the ass should clear it up.
Hole- Posts : 11121
Points : 11099
Join date : 2018-03-24
Age : 48
Location : Scholzistan
- Post n°195
Re: Icebreakers
Still outdone by Norway loosing a billion dollar frigate.
George1- Posts : 18520
Points : 19025
Join date : 2011-12-22
Location : Greece
- Post n°196
Re: Icebreakers
The Russian prime minister, Dmitry Medvedev, visited the Baltic shipyard on November, 28th. He announced the continuation of the construction of nuclear icebreakers of the LK-60Ya-class (Project 22220). He also announced that Russia will order two additional icebreakers of this class in the next months, after the completion of the first three, Arktika, Sibir and Ural, that are already under construction. As a universal nuclear-powered icebreaker, the LK-60Ya can operate on deep sea and also on rivers.
He also announced, that the Baltic shipyard will take part in the construction of the "Leader"-class icebreaker (LK-120Ya, Project 10510), that is intended for construction at the Zvezda shipyard in Russia's Far East. Because of it's weight, the LK-120Ya can only operate on the deep sea.
https://www.fontanka.ru/2018/11/28/124/?fbclid=IwAR0AR41wQHSdc1qJMU_scGLWqdFRiP3kOHWBwncw1cR6qkUC9-EFeqQjASw
He also announced, that the Baltic shipyard will take part in the construction of the "Leader"-class icebreaker (LK-120Ya, Project 10510), that is intended for construction at the Zvezda shipyard in Russia's Far East. Because of it's weight, the LK-120Ya can only operate on the deep sea.
https://www.fontanka.ru/2018/11/28/124/?fbclid=IwAR0AR41wQHSdc1qJMU_scGLWqdFRiP3kOHWBwncw1cR6qkUC9-EFeqQjASw
Tsavo Lion- Posts : 5960
Points : 5912
Join date : 2016-08-15
Location : AZ, USA
- Post n°197
Re: Icebreakers
I wonder why they put a helo pad on the bow instead of fantail? Not safe IMO!
http://tehnoomsk.ru/node/3398
We still don't have enough nuclear icebreakers
http://tehnoomsk.ru/node/3398
We still don't have enough nuclear icebreakers
Tingsay- Posts : 183
Points : 185
Join date : 2016-12-09
- Post n°198
Re: Icebreakers
Tsavo Lion wrote:I wonder why they put a helo pad on the bow instead of fantail? Not safe IMO!
http://tehnoomsk.ru/node/3398
We still don't have enough nuclear icebreakers
Looks really good though, very unique.
dino00- Posts : 1677
Points : 1714
Join date : 2012-10-12
Age : 37
Location : portugal
- Post n°199
Re: Icebreakers
The cost of creating two icebreakers of the project 22220 will be about 100 billion rubles
Earlier it was reported that the contract for the construction of the fourth and fifth icebreakers could be concluded with the Baltic plant in the first quarter of 2019
SAINT-PETERSBURG, December 5th. / TASS /. The construction of the fourth and fifth nuclear icebreakers of the project 22220 will cost about 100 billion rubles. Alexey Smirnov, Project Manager 22220 at the Baltic Shipyard, told this to journalists on the sidelines of the Arctic: Present and Future Forum.
Earlier, a TASS source in industrial circles of St. Petersburg announced that a contract for the construction of the fourth and fifth icebreakers 22220 could be concluded with the Baltic Shipyard in the first quarter of 2019. Later, the deputy head of the Directorate of the Northern Sea Route, Maxim Kulinko, stated that the construction of these vessels would use a mixed financing scheme.
"The cost of construction for two vessels combined in the amount of about 100 billion rubles, which includes both the cost of construction and indirect costs ... ensuring guarantees of contract execution, including insurance of the vessel during construction," said Smirnov. He noted that the contract provides funding for the contracting of equipment for both vessels at once, which will help reduce the cost of the order.
https://tass.ru/ekonomika/5876084
Earlier it was reported that the contract for the construction of the fourth and fifth icebreakers could be concluded with the Baltic plant in the first quarter of 2019
SAINT-PETERSBURG, December 5th. / TASS /. The construction of the fourth and fifth nuclear icebreakers of the project 22220 will cost about 100 billion rubles. Alexey Smirnov, Project Manager 22220 at the Baltic Shipyard, told this to journalists on the sidelines of the Arctic: Present and Future Forum.
Earlier, a TASS source in industrial circles of St. Petersburg announced that a contract for the construction of the fourth and fifth icebreakers 22220 could be concluded with the Baltic Shipyard in the first quarter of 2019. Later, the deputy head of the Directorate of the Northern Sea Route, Maxim Kulinko, stated that the construction of these vessels would use a mixed financing scheme.
"The cost of construction for two vessels combined in the amount of about 100 billion rubles, which includes both the cost of construction and indirect costs ... ensuring guarantees of contract execution, including insurance of the vessel during construction," said Smirnov. He noted that the contract provides funding for the contracting of equipment for both vessels at once, which will help reduce the cost of the order.
https://tass.ru/ekonomika/5876084
Singular_Transform- Posts : 1032
Points : 1014
Join date : 2016-11-13
- Post n°200
Re: Icebreakers
dino00 wrote:The cost of creating two icebreakers of the project 22220 will be about 100 billion rubles
Earlier it was reported that the contract for the construction of the fourth and fifth icebreakers could be concluded with the Baltic plant in the first quarter of 2019
SAINT-PETERSBURG, December 5th. / TASS /. The construction of the fourth and fifth nuclear icebreakers of the project 22220 will cost about 100 billion rubles. Alexey Smirnov, Project Manager 22220 at the Baltic Shipyard, told this to journalists on the sidelines of the Arctic: Present and Future Forum.
Earlier, a TASS source in industrial circles of St. Petersburg announced that a contract for the construction of the fourth and fifth icebreakers 22220 could be concluded with the Baltic Shipyard in the first quarter of 2019. Later, the deputy head of the Directorate of the Northern Sea Route, Maxim Kulinko, stated that the construction of these vessels would use a mixed financing scheme.
"The cost of construction for two vessels combined in the amount of about 100 billion rubles, which includes both the cost of construction and indirect costs ... ensuring guarantees of contract execution, including insurance of the vessel during construction," said Smirnov. He noted that the contract provides funding for the contracting of equipment for both vessels at once, which will help reduce the cost of the order.
https://tass.ru/ekonomika/5876084
The two icebreaker cost as much as a nimitz carrier.