SEVMASH; in my opinion, the most important link in the Russian military-industrial conflict.The scope of work on Sevmash is huge. I don't know where this list came from, but it was published on balancer.ru. And on this list is the same thing that I assumed, that is, that the K-564 will not be operational until 2024, while the K-571 Krasnoyarsk will most likely be handed over to the Russian Navy.
However, the "genius" who made this list did not include in it the 11th and 12th submarines of the Borei project, for the construction of which the contract was signed, but he did include the 9th and 10th submarines of the Yasen project, for which the contract has not yet been officially signed - which does not mean that it will not be.
By the end of 2028/2029;
Project 885/885M; Either way, one Project 885 and eight Project 885M submarines should be operational by the end of 2029.
After that period, two more project 885M submarines would be under construction - the 9th and 10th submarines.Project 955/955A; As things currently stand, Russia will certainly have 3 submarines 955 and 5 submarines 955A project by 2026, while by the end of 2029 it could have as many as 10.
After that period, two more project 955A submarines would be under construction - the 11th and 12th submarine.
Project 09852; K-329 Belgorod is delivered.
Project 09851/09853; Project 09851 submarine is the most secretive of all the Russian submarines under construction and is scheduled to be operational by 2025.
The list also states the start of construction of submarine project 09853 from 2023, as well as two more submarines of that project in 2024 and 2025.From 2012 to 2020; The first 3 Project 955 (K-535 Dolgorukiy, K-550 Nevsky, K-551 Monomakh) submarines and one Project 885 submarine (K-560 Severodvinsk) were delivered over the past decade. FOUR SUBMARINES.
*
From 2020 to 2022;
In this decade since the beginning of 2020, Sevmash has delivered 5 nuclear submarines;
* 2020; K-549 Knyaz Vladimir (955A),
* 2021; K-552 Knyaz Oleg (955A), K-561 Kazan (885M), K-573 Novosibirsk (885M),
* 2022; K-329 (Belgorod) and twoo more soon "Generalissimus Suvorov" (955) and K-571 Krasnoyarsk (885). SEVEN SUBMARINES.
From 2023 to 2028/2029; we can expect the delivery of TEN more submarines;
* FIVE of project 885M; submarines Arkhangelsk, Perm, Ulyanovsk , Voronezh and Vladivostok
* FOUR of project 955A, Imperator Aleksander III, Knyaz Pozharskiy, Dmitry Donskoy and Knyaz Potemkin
* ONE of project 09851; Khabarovsk.
According to the list, we already know that
at least 7 more submarines will be under construction by the end of this decade; two 885M (9th and 10th), two 955A (11th and 12th), as well as 3 projects 09853 (1st, 2nd and 3rd). Anyway, this decade has just begun and Sevmash will have a lot of work and many new contracts that we don't know about yet.
Bearing in mind that there is only one shipyard in question, Sevmash builds the most combat units, and at the same time, these are submarines that have a far greater displacement than other Russian ships and submarines under construction - except for the two ships of project 23900.
* To sum up;
ELEVEN delivered submarines ; K-535 Dolgorukiy, K-550 Nevsky, K-551 Monomakh, K-560 Severodvinsk, K-549 Knyaz Vladimir (955A), K-552 Knyaz Oleg (955A), K-561 Kazan (885M), K-573 Novosibirsk (885M), K-329 (Belgorod) and twoo more soon "Generalissimus Suvorov" (955) and K-571 Krasnoyarsk (885).
TEN more submarines in the next seven years ; submarines Arkhangelsk, Perm, Ulyanovsk , Voronezh and Vladivostok (all 885M); Imperator Aleksander III, Knyaz Pozharskiy, Dmitry Donskoy and Knyaz Potemkin (all 955A) and ONE of project 09851; Khabarovsk.
SEVEN more in construction; TWOO 885M, TWOO 955A and THREE 09853. Thats 28 in total.
My assumption is that in the period from 2030 to 2040, that number will reach 35 to 40 submarines built and delivered to the Russian Navy in the period from 2012 to 2040.
And in the end it will turn out that Sevmash is able to build nuclear submarines for the Russian VMF on its own.