+89
Sujoy
Tolstoy
Mir
RTN
Kiko
ALAMO
mnztr
lancelot
LMFS
limb
Lurk83
The_Observer
Tai Hai Chen
owais.usmani
Tingsay
MiamiMachineShop
DerWolf
The-thing-next-door
Hole
PTURBG
Labrador
marcellogo
verkhoturye51
kumbor
Kimppis
Peŕrier
Luq man
littlerabbit
Rodion_Romanovic
Benya
hoom
miroslav
AlfaT8
Isos
kvs
GarryB
chicken
Singular_Transform
miketheterrible
Singular_trafo
wilhelm
Svyatoslavich
jhelb
GRU
KiloGolf
DB1234
SeigSoloyvov
JohninMK
max steel
zardof
galicije83
George1
calripson
marat
Rmf
artjomh
PapaDragon
GunshipDemocracy
franco
flamming_python
Honesroc
Cyberspec
Big_Gazza
ult
Morpheus Eberhardt
T055
Mike E
Flyingdutchman
Dima
zg18
Vympel
magnumcromagnon
navyfield
zino
GJ Flanker
medo
Vann7
runaway
etaepsilonk
sepheronx
Notio
xeno
Austin
Viktor
KomissarBojanchev
TR1
TheArmenian
Admin
Russian Patriot
93 posters
Project 11356: Admiral Grigorovich
calripson- Posts : 753
Points : 808
Join date : 2013-10-26
- Post n°251
Timeline
When is the planned commissioning into the BSF of the Admiral Grigorovich and Admiral Essen ?
George1- Posts : 18510
Points : 19013
Join date : 2011-12-22
Location : Greece
- Post n°252
Re: Project 11356: Admiral Grigorovich
calripson wrote:When is the planned commissioning into the BSF of the Admiral Grigorovich and Admiral Essen ?
Admiral Grigorovich i think its a matter of weeks. Admiral Essen in mid 2016
Isos- Posts : 11593
Points : 11561
Join date : 2015-11-06
- Post n°253
Re: Project 11356: Admiral Grigorovich
What is the average detection range of a frigate's radar like Grigorovitch's one vs a frigate, corvette and destroyer ?
George1- Posts : 18510
Points : 19013
Join date : 2011-12-22
Location : Greece
- Post n°254
Re: Project 11356: Admiral Grigorovich
Frigate "Admiral Grigorovich" arrived at the Northern Fleet for tests
Guest- Guest
- Post n°255
Re: Project 11356: Admiral Grigorovich
Isos wrote:What is the average detection range of a frigate's radar like Grigorovitch's one vs a frigate, corvette and destroyer ?
3Ts-25E target detection, tracking and acquisition.
George1- Posts : 18510
Points : 19013
Join date : 2011-12-22
Location : Greece
- Post n°256
Re: Project 11356: Admiral Grigorovich
Russia's new frigate completes certification trials
The Admiral Grigorovich is the lead frigate of project 11356 armed with ship-born missile Kalibr-NK missile system, and Shtil-1 multi-channel air defense system and Palash air defense system
KALININGRAD, December 30. /TASS/. The newest frigate Admiral Grigorovich, built at the Yantar shipyards in Kaliningrad for the Black Sea Fleet, has completed trials in the Barents Sea, the shipyard’s spokesman, Sergey Mikhailov, has told TASS. Read also Russian Navy will get first fifth generation sub in two years — designer Russian Navy to get seven warships, two subs in 2016 — defense minister Russian Navy gets new rescue ship Russian Navy ships in fight against Islamic State
"The second and last phase of the certification tests is over. It was conducted at test sites of the Northern Fleet in the Barents Sea. The ship’s Kalibr and Shtil weapon systems were seen in action. All went well. The ship is about to make a voyage to Kaliningrad now."
It is expected to arrive there in early January. Preparations for its handover to the Navy will follow. In February, the Russian Navy’s flag will be hoisted on board and the ship will leave for its permanent base on the Black Sea.
The Admiral Grigorovich escort ship is the lead frigate of project 11356. Its frame was laid on December 18, 2010 and the ship launched on March 14, 2014. Certification trials began on October 14, 2015. Under two contracts with the Defense Ministry Yantar will build a family of six escort ships of project 11356.
The frigate’s parameters are as follows: displacement - 4,000 tonnes, speed - 30 knots, endurance - 30 days, weaponry - ship-born missile complex Kalibr-NK armed with a high accuracy cruise missile, and multi-channel air defense complex Shtil-1 and air defense artillery complex Palash.
More:
http://tass.ru/en/defense/847982
The Admiral Grigorovich is the lead frigate of project 11356 armed with ship-born missile Kalibr-NK missile system, and Shtil-1 multi-channel air defense system and Palash air defense system
KALININGRAD, December 30. /TASS/. The newest frigate Admiral Grigorovich, built at the Yantar shipyards in Kaliningrad for the Black Sea Fleet, has completed trials in the Barents Sea, the shipyard’s spokesman, Sergey Mikhailov, has told TASS. Read also Russian Navy will get first fifth generation sub in two years — designer Russian Navy to get seven warships, two subs in 2016 — defense minister Russian Navy gets new rescue ship Russian Navy ships in fight against Islamic State
"The second and last phase of the certification tests is over. It was conducted at test sites of the Northern Fleet in the Barents Sea. The ship’s Kalibr and Shtil weapon systems were seen in action. All went well. The ship is about to make a voyage to Kaliningrad now."
It is expected to arrive there in early January. Preparations for its handover to the Navy will follow. In February, the Russian Navy’s flag will be hoisted on board and the ship will leave for its permanent base on the Black Sea.
The Admiral Grigorovich escort ship is the lead frigate of project 11356. Its frame was laid on December 18, 2010 and the ship launched on March 14, 2014. Certification trials began on October 14, 2015. Under two contracts with the Defense Ministry Yantar will build a family of six escort ships of project 11356.
The frigate’s parameters are as follows: displacement - 4,000 tonnes, speed - 30 knots, endurance - 30 days, weaponry - ship-born missile complex Kalibr-NK armed with a high accuracy cruise missile, and multi-channel air defense complex Shtil-1 and air defense artillery complex Palash.
More:
http://tass.ru/en/defense/847982
George1- Posts : 18510
Points : 19013
Join date : 2011-12-22
Location : Greece
- Post n°257
Re: Project 11356: Admiral Grigorovich
Frigate "Admiral Grigorovich" completed state tests. Transfer to the Navy is planned for February
http://bmpd.livejournal.com/1664512.html
http://bmpd.livejournal.com/1664512.html
George1- Posts : 18510
Points : 19013
Join date : 2011-12-22
Location : Greece
- Post n°258
Re: Project 11356: Admiral Grigorovich
Frigate "Admiral Essen" began public testing
KALININGRAD, February 1 - RIA Novosti. Frigate "Admiral Essen" Project 11356, built on the Baltic Shipyard (Shipyard) "Yantar" in Kaliningrad commissioned by the Russian Navy, started the state tests in the Baltic Sea, the press service of the company.
"Currently, commissioning team of the plant and the crew preparing for the first sail which will take place this week. The state tests will last about a month, they will pass on the sea ranges of the Baltic Fleet. The transfer of the ship of the Russian Navy is scheduled for April 2016," - he said in the message.
galicije83- Posts : 211
Points : 213
Join date : 2015-04-30
Age : 44
Location : Serbia
- Post n°259
Frigate "Admiral Essen" began public testing
Admiral Essen isnt Gorshkov class frigate, its Grigorovich class frigate mate....George1 wrote:Frigate "Admiral Essen" began public testing
KALININGRAD, February 1 - RIA Novosti. Frigate "Admiral Essen" Project 11356, built on the Baltic Shipyard (Shipyard) "Yantar" in Kaliningrad commissioned by the Russian Navy, started the state tests in the Baltic Sea, the press service of the company.
"Currently, commissioning team of the plant and the crew preparing for the first sail which will take place this week. The state tests will last about a month, they will pass on the sea ranges of the Baltic Fleet. The transfer of the ship of the Russian Navy is scheduled for April 2016," - he said in the message.
zardof- Posts : 29
Points : 35
Join date : 2016-01-04
Age : 65
Location : France
- Post n°260
Admiral Grigorovich transfer
Finally transfer to navy is for beginning of March (http://flotprom.ru/2016/%D0%AF%D0%BD%D1%82%D0%B0%D1%80%D1%8C7/)
Essen will follow soon after if no problems.
Admiral Grigorovich is 745, Admiral Essen 751.... i don't see recent pictures of Admiral Makarov who is quite finished. If somebody have idea of number ?
Essen will follow soon after if no problems.
Admiral Grigorovich is 745, Admiral Essen 751.... i don't see recent pictures of Admiral Makarov who is quite finished. If somebody have idea of number ?
George1- Posts : 18510
Points : 19013
Join date : 2011-12-22
Location : Greece
- Post n°261
Re: Project 11356: Admiral Grigorovich
Frigate "Admiral Grigorovich" will be given to the Russian Navy on March 10
Подробнее на ТАСС:
https://translate.googleusercontent.com/translate_c?depth=1&hl=en&rurl=translate.google.com&sl=auto&tl=en&u=http://tass.ru/armiya-i-opk/2708931&usg=ALkJrhg05lzL_jjnmUslXLdHE-YWdHqwHw
Подробнее на ТАСС:
https://translate.googleusercontent.com/translate_c?depth=1&hl=en&rurl=translate.google.com&sl=auto&tl=en&u=http://tass.ru/armiya-i-opk/2708931&usg=ALkJrhg05lzL_jjnmUslXLdHE-YWdHqwHw
Dima- Posts : 1222
Points : 1233
Join date : 2012-03-22
- Post n°262
Re: Project 11356: Admiral Grigorovich
Excellent news!George1 wrote:Frigate "Admiral Grigorovich" will be given to the Russian Navy on March 10
Подробнее на ТАСС:
https://translate.googleusercontent.com/translate_c?depth=1&hl=en&rurl=translate.google.com&sl=auto&tl=en&u=http://tass.ru/armiya-i-opk/2708931&usg=ALkJrhg05lzL_jjnmUslXLdHE-YWdHqwHw
Btw, when can we expect the second unit?
April 2016 mentioned in the news item posted above is for Admiral Essen or is it for Pr.22350 Admiral Gorshkov?
zardof- Posts : 29
Points : 35
Join date : 2016-01-04
Age : 65
Location : France
- Post n°263
Re: Project 11356: Admiral Grigorovich
According to Flot "amiral Grigorovitch" fregate will be commission on 10 of march... but also "amiral Essen" and "Admiral Makarov" will be also commission this year. With 3 project 11356 plus the 3 new Pr21631 " Zeliony Dol", "Serpukhov", "Vishny Volochek; 1 project 22160 "V. Bykov" and 5 to 6 Kilo. 2016 will see a real significant change in Black sea fleet.
Erdogan will cry so mutch !!!!
http://flot.com/2016/%D0%AF%D0%BD%D1%82%D0%B0%D1%80%D1%8C9/
Erdogan will cry so mutch !!!!
http://flot.com/2016/%D0%AF%D0%BD%D1%82%D0%B0%D1%80%D1%8C9/
GunshipDemocracy- Posts : 6165
Points : 6185
Join date : 2015-05-17
Location : fishin on Stalin´s Strait between Mexico and Canada
- Post n°264
Re: Project 11356: Admiral Grigorovich
zardof wrote:According to Flot "amiral Grigorovitch" fregate will be commission on 10 of march... but also "amiral Essen" and "Admiral Makarov" will be also commission this year. With 3 project 11356 plus the 3 new Pr21631 " Zeliony Dol", "Serpukhov", "Vishny Volochek; 1 project 22160 "V. Bykov" and 5 to 6 Kilo. 2016 will see a real significant change in Black sea fleet.
Erdogan will cry so mutch !!!!
http://flot.com/2016/%D0%AF%D0%BD%D1%82%D0%B0%D1%80%D1%8C9/
With 16 frigates/8 corvettes/13 subs and 21 missile boats unlikely unfortunately
https://en.wikipedia.org/wiki/List_of_active_ships_of_the_Turkish_Naval_Forces
Isos- Posts : 11593
Points : 11561
Join date : 2015-11-06
- Post n°265
Re: Project 11356: Admiral Grigorovich
GunshipDemocracy wrote:zardof wrote:According to Flot "amiral Grigorovitch" fregate will be commission on 10 of march... but also "amiral Essen" and "Admiral Makarov" will be also commission this year. With 3 project 11356 plus the 3 new Pr21631 " Zeliony Dol", "Serpukhov", "Vishny Volochek; 1 project 22160 "V. Bykov" and 5 to 6 Kilo. 2016 will see a real significant change in Black sea fleet.
Erdogan will cry so mutch !!!!
http://flot.com/2016/%D0%AF%D0%BD%D1%82%D0%B0%D1%80%D1%8C9/
With 16 frigates/8 corvettes/13 subs and 21 missile boats unlikely unfortunately
https://en.wikipedia.org/wiki/List_of_active_ships_of_the_Turkish_Naval_Forces
With the Su-30/34 equiped with EW and Brahmos-NG(??), yes he will cry !!!
PapaDragon- Posts : 13463
Points : 13503
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°266
Re: Project 11356: Admiral Grigorovich
Isos wrote:GunshipDemocracy wrote:zardof wrote:According to Flot "amiral Grigorovitch" fregate will be commission on 10 of march... but also "amiral Essen" and "Admiral Makarov" will be also commission this year. With 3 project 11356 plus the 3 new Pr21631 " Zeliony Dol", "Serpukhov", "Vishny Volochek; 1 project 22160 "V. Bykov" and 5 to 6 Kilo. 2016 will see a real significant change in Black sea fleet.
Erdogan will cry so mutch !!!!
http://flot.com/2016/%D0%AF%D0%BD%D1%82%D0%B0%D1%80%D1%8C9/
With 16 frigates/8 corvettes/13 subs and 21 missile boats unlikely unfortunately
https://en.wikipedia.org/wiki/List_of_active_ships_of_the_Turkish_Naval_Forces
With the Su-30/34 equiped with EW and Brahmos-NG(??), yes he will cry !!!
Turk navy has to deal with Greece, Israel and Cyprus on top of Russian BSF so those turk ships will be stretched thin and mighty busy...
TheArmenian- Posts : 1880
Points : 2025
Join date : 2011-09-14
- Post n°267
Re: Project 11356: Admiral Grigorovich
Admiral Butakov, 4th unit of the class has been launched today.
As far as I know, it has been launched without the poweplant being installed.
It will get the machinery later on, probably 2017 or 2018.
As far as I know, it has been launched without the poweplant being installed.
It will get the machinery later on, probably 2017 or 2018.
George1- Posts : 18510
Points : 19013
Join date : 2011-12-22
Location : Greece
- Post n°268
Re: Project 11356: Admiral Grigorovich
TheArmenian wrote:Admiral Butakov, 4th unit of the class has been launched today.
As far as I know, it has been launched without the poweplant being installed.
It will get the machinery later on, probably 2017 or 2018.
So the project didn't discontinued after 3rd ship?
GunshipDemocracy- Posts : 6165
Points : 6185
Join date : 2015-05-17
Location : fishin on Stalin´s Strait between Mexico and Canada
- Post n°269
Re: Project 11356: Admiral Grigorovich
George1 wrote:TheArmenian wrote:Admiral Butakov, 4th unit of the class has been launched today.
As far as I know, it has been launched without the poweplant being installed.
It will get the machinery later on, probably 2017 or 2018.
So the project didn't discontinued after 3rd ship?
Russian power plants were to be ready in 2017/2018 within import replacement programme.
PapaDragon- Posts : 13463
Points : 13503
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°270
Re: Project 11356: Admiral Grigorovich
GunshipDemocracy wrote:George1 wrote:TheArmenian wrote:Admiral Butakov, 4th unit of the class has been launched today.
As far as I know, it has been launched without the poweplant being installed.
It will get the machinery later on, probably 2017 or 2018.
So the project didn't discontinued after 3rd ship?
Russian power plants were to be ready in 2017/2018 within import replacement programme.
Engines aside (it will be handled as you said) that shipyard got really good at building these frigates. Would it be possible to order more of them after 6th ship?
I know it is not latest and the greatest but it still gets the job done, it can be built in numbers and on time and is only slightly more expensive than 20380 Steregushchy corvette which are loaded with issues. They might keep up with Grigorevich frigate for a while longer while they sort out next corvette class.
They also have decent upgrade potential later down the road.
Last edited by PapaDragon on Thu Mar 03, 2016 10:57 pm; edited 1 time in total
Isos- Posts : 11593
Points : 11561
Join date : 2015-11-06
- Post n°271
Re: Project 11356: Admiral Grigorovich
George1- Posts : 18510
Points : 19013
Join date : 2011-12-22
Location : Greece
- Post n°272
Re: Project 11356: Admiral Grigorovich
Construction of the six patrol ships of the modified project 11356 (sometimes referred to as the project 11356R or 11357) maintained Shipyard "Yantar" in Kaliningrad on two contracts for three ships, each signed with the Russian Ministry of Defense - the contract number 704/27/2 / PMC / SC / 1176 -10 of 28 October 2010 (the first three) and contract number W / 1/1/0553 / GK-11-DGOZ of 13 September 2011 (the second trio). The cost of each contract is 40 billion rubles. All six ships initially planned to replenish the Black Sea Fleet.
Under the first contract to date, we completed the construction of patrol ships "Admiral Grigorovich" (serial number 01357, the State completed the test, the signing of the act of reception and transmission of the Navy is scheduled for March 10-11, 2016) and "Admiral Essen" (serial number 01358 is on State test phase since January 30, 2016). A third of the same type frigate "Admiral Makarov" (serial number 01359) Launched September 3, 2015, is located in the Shipyard "Yantar" in the completion.
Head frigate under the second contract "Admiral Butakov" (serial number 01360) was laid on the Shipyard "Yantar" July 12, 2013, and launched today. November 15, 2013 was laid down as the next patrol ship "Admiral Istomin" (serial number 01361). Bookmark last scheduled six ships, "Admiral Kornilov" (serial number 01362) to date have not produced, although the groundwork was prepared for him.
Refusal of advertising descent "Admiral Butakova" looks natural, because the fate of the second trio of modified frigates of Project 11356 for the Russian fleet is now under question, because of lack for them of the main gas turbine power plants production Nikolaev State Enterprise "Zorya" - "Mashproekt" undelivered for these vehicles due to the events in Ukraine. Because of this, completion of two frigates laid second three, most likely, it will be suspended after the descent of the water (and the descent itself is required mainly for the release of stocks of the plant).
Recall that, according to a press release Nicholas State Enterprise "Zorya" February 25, 2016 - "Mashproekt", is a company in October 2012 signed with Shipyard "Yantar" contract to supply three sets of power generating units M7N for the second three Russian frigates modified project 11356 According to this contract, the Nikolaev enterprise must put on the "Amber" the first unit in December 2014, and the second and third - in October-December 2015.
In June 2014 the order of the State Service of Export Control of Ukraine suspended the export licenses of military goods to the Russian Federation. In connection with this work commissioned for the "Amber" at the Research and Production Complex "Zorya" - "Mashproekt" were discontinued. Gas turbine DS-71 and DT-59 M7N first unit (designed for frigate "Admiral Butakov") at the time were made Nikolaev now, but bench tests conducted were gone. All equipment was suspended and sent into the production storage.
http://bmpd.livejournal.com/1772910.html
So after 5th ship the project will be stopped. 6th ship hasn't been laid down till now
Also some photos of "Admiral Butakov"
GunshipDemocracy- Posts : 6165
Points : 6185
Join date : 2015-05-17
Location : fishin on Stalin´s Strait between Mexico and Canada
- Post n°273
Re: Project 11356: Admiral Grigorovich
PapaDragon wrote:GunshipDemocracy wrote:George1 wrote:TheArmenian wrote:Admiral Butakov, 4th unit of the class has been launched today.
As far as I know, it has been launched without the poweplant being installed.
It will get the machinery later on, probably 2017 or 2018.
So the project didn't discontinued after 3rd ship?
Russian power plants were to be ready in 2017/2018 within import replacement programme.
Engines aside (it will be handled as you said) that shipyard got really good at building these frigates. Would it be possible to order more of them after 6th ship?
I know it is not latest and the greatest but it still gets the job done, it can be built in numbers and on time and is only slightly more expensive than 20380 Steregushchy corvette which are loaded with issues. They might keep up with Grigorevich frigate for a while longer while they sort out next corvette class.
They also have decent upgrade potential later down the road.
Since displacement is 2x as 20380 for lead ship for smal task force (like 22800/22380 or Buyans) a bit biff up VLS for AShW (16 or 20 possible with say 4xASROC Calibres and 16 Onyxes/Claibres) add Packet torpedoes also for self-defense form incoming torpedoes. and not 3x but 4x12 Buk missiles. Is possible Panstir-M
This kind of ship can lead small team of Buyans and keep them relatively save in Mediterranean. But 11356 has disadvantage - she is on level of of western frigates about to be retired. So when they come their adversaries might be one gen ahead.
Russian shall probably ocus on improvements of newer classes.
PapaDragon- Posts : 13463
Points : 13503
Join date : 2015-04-26
Location : Fort Evil, Serbia
- Post n°274
Re: Project 11356: Admiral Grigorovich
Admiral Grigorovich to be officially accepted into service on March 11.
http://flot.com/2016/%D0%AF%D0%BD%D1%82%D0%B0%D1%80%D1%8C9/
George1- Posts : 18510
Points : 19013
Join date : 2011-12-22
Location : Greece
- Post n°275
Re: Project 11356: Admiral Grigorovich
St. Andrew flag hoisted on Russia's Project 11356 lead frigate
KALININGRAD, March 11. /TASS/. The Project 11356 lead frigate, the Admiral Grigorovich, has entered service in the Russian Navy after the flag hoisting ceremony, a TASS correspondent reports from the scene.
The solemn ceremony of hoisting the St. Andrew naval flag on the frigate Admiral Grigorovich was attended by Black Sea Fleet Commander Alexander Vitko, representatives of the United Shipbuilding Corporation and the administration of the Kaliningrad Region, as well as the descendants of Admiral Ivan Grigorovich in whose honor the frigate was named.
The ceremony of hoisting the St. Andrew flag on the Admiral Grigorovich frigate was preceded a day earlier by the warship’s acceptance at the Yantar Shipyard, which is building the Project 11356 frigates for the Russian Black Sea Fleet.
This year, two more frigates of this series, the Admiral Essen and the Admiral Makarov, are expected to join the Russian Black Sea Fleet.
The Project 11356 frigates have been designed by the Severnoye Design Bureau in St. Petersburg.
More:
http://tass.ru/en/defense/861624
KALININGRAD, March 11. /TASS/. The Project 11356 lead frigate, the Admiral Grigorovich, has entered service in the Russian Navy after the flag hoisting ceremony, a TASS correspondent reports from the scene.
The solemn ceremony of hoisting the St. Andrew naval flag on the frigate Admiral Grigorovich was attended by Black Sea Fleet Commander Alexander Vitko, representatives of the United Shipbuilding Corporation and the administration of the Kaliningrad Region, as well as the descendants of Admiral Ivan Grigorovich in whose honor the frigate was named.
The ceremony of hoisting the St. Andrew flag on the Admiral Grigorovich frigate was preceded a day earlier by the warship’s acceptance at the Yantar Shipyard, which is building the Project 11356 frigates for the Russian Black Sea Fleet.
This year, two more frigates of this series, the Admiral Essen and the Admiral Makarov, are expected to join the Russian Black Sea Fleet.
The Project 11356 frigates have been designed by the Severnoye Design Bureau in St. Petersburg.
More:
http://tass.ru/en/defense/861624