Russia Defence Forum

Would you like to react to this message? Create an account in a few clicks or log in to continue.

Military Forum for Russian and Global Defence Issues


+43
sepheronx
thegopnik
caveat emptor
Podlodka77
Krepost
kvs
miketheterrible
miroslav
Rasisuki Nebia
The_Observer
Arkanghelsk
Broski
Shadåw
Granger
marat
calripson
Russian_Patriot_
ALAMO
lancelot
Lurk83
mnztr
TMA1
medo
Tai Hai Chen
Maximmmm
marcellogo
hoom
PapaDragon
LMFS
lyle6
flamming_python
The-thing-next-door
Big_Gazza
walle83
Begome
George1
franco
Isos
limb
owais.usmani
Arrow
Hole
AJ-47
47 posters

    Project 20380(5): Steregushchy Corvette #2

    PapaDragon
    PapaDragon


    Posts : 13472
    Points : 13512
    Join date : 2015-04-26
    Location : Fort Evil, Serbia

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  PapaDragon Tue Dec 21, 2021 3:37 am

    kvs wrote:
    calripson wrote:Were there engines even installed? Awful slow progress was being made on that ship. Almost seems like a lack of skilled workers given the workload Severnaya Wharf has.

    Obviously no hurry to build it. Russia does not need such vessels for defense and it does not engage in globo-cop patrols.
    It would be nice to have, but people on this board are overly fixated on these things.


    We are reaching levels of cope previously unimaginable lol1 Razz



    flamming_python, Maximmmm, walle83, owais.usmani, lancelot and Broski like this post

    avatar
    walle83


    Posts : 976
    Points : 986
    Join date : 2016-11-12
    Location : Sweden

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  walle83 Tue Dec 21, 2021 5:55 am

    kvs wrote:
    calripson wrote:Were there engines even installed? Awful slow progress was being made on that ship. Almost seems like a lack of skilled workers given the workload Severnaya Wharf has.

    Obviously no hurry to build it.   Russia does not need such vessels for defense and it does not engage in globo-cop patrols.  
    It would be nice to have, but people on this board are overly fixated on these things.


    Its not like they have many other projects to choose from in the same weightclass.
    Arkanghelsk
    Arkanghelsk


    Posts : 3909
    Points : 3915
    Join date : 2021-12-08

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Arkanghelsk Tue Dec 21, 2021 3:36 pm

    This ship is a nice ship for patrolling some japanese islands , with the caveat of nice Kalibr missiles, redut, and anti sub capabilities.

    But ultimately Russia has other options to deliver these weapons to enemy forces.

    INF is gone so Kalibr will be launched from any point that is thousands of km from intended target.

    Provorniy in particular was for the pacific fleet. But we are aware that both S400 and S300VM are stationed at Matua and Iturup as well as Sakhalin.

    As for the anti submarine capabilities, theres no shortage of ASW planes, submarines, and ships available.

    20380 is performing this task and Rezkiy is coming online anyway.

    Yes Provorniy is for sure a wonderful addition to the fleet. But as stated numerous times:

    It's being rebuilt and most likely the commission date will slip to 1 year, and ship was not far along as it was. Fiberglass superstructure is rebuilt in 6 months max. Everything else can take another 6 months. it's small blip for RU and at most, points to needed updates to work standards and management will be responsible for it.

    In the end is not big deal. 1 corvette is not factoring into Kremlin plans to establish dominance over NATO, Japan, or any other potential aggressor, Russia is too prepared in this regard.

    GarryB and Hole like this post

    GarryB
    GarryB


    Posts : 40541
    Points : 41041
    Join date : 2010-03-30
    Location : New Zealand

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  GarryB Wed Dec 22, 2021 8:06 am

    It has taken decades worth of man hours to develop and design and get right all the technologies that went in to this boat, the fact that the technologies are in service on other versions of this boat already means a delay for one boat is hardly the end of the world... it is not like they have to completely redesign the thing.

    They just need to rip out the damaged parts and wipe down and clean the parts that will stay and then put in new parts.

    Not a big deal.

    It is not like they built a stealth fighter and sent it to the border of Iran and Iraq ready to sneak in and blow shit up without being noticed and then have Russia tell Iran there are stealth fighters on their border that they are tracking in real time from 5,000km away and you should be on high alert.

    That would be a crushing revelation that the most expensive fighter programme you have ever run because it is so stealthy and so easy to support with its super support system is not stealthy at all and the support system has been cancelled so it will remain a financial burden to all its customers for the live time of the aircraft... unless the rumours of china getting the plans are true and they can offer upgrades and changes to make the thing work and make it affordable to operate...

    Arkanghelsk likes this post

    George1
    George1


    Posts : 18521
    Points : 19026
    Join date : 2011-12-22
    Location : Greece

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  George1 Wed Dec 22, 2021 8:54 am

    George1
    George1


    Posts : 18521
    Points : 19026
    Join date : 2011-12-22
    Location : Greece

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  George1 Wed Dec 22, 2021 8:55 am

    On Monday, December 20, Severnaya Verf issued a press release , in which it stated:

    “On the weekend after the completion of the fire extinguishing work on the " Provorny " corvette , the Severnaya Verf specialists carried out its initial inspection. The factory services preliminarily established that, thanks to the mounted fire insulation between the superstructure and the deck, the ship's hull was not damaged. The superstructure must be dismantled. There was no equipment in the superstructure. Negotiations are underway with JSC SNSZ on the construction of a new superstructure.

    To prevent freezing of the water that got into the hold during the extinguishing of the fire, heating and electricity were ordered on Saturday and Sunday, about 100 workers provided the pumping of water and drying the surfaces. They also cleaned the premises from the effects of the fire.

    To assess the damage, a commission was created from representatives of the plant and the USC, and it started to work. It is too early to talk about the causes of the fire. It will take several weeks for an authorized commission to investigate the circumstances and determine the cause ”[end of release].

    Later, an unofficial source at Severnaya Verf estimated the cost of damage from the fire at 22 billion rubles.


    https://bmpd.livejournal.com/4451364.html
    avatar
    ALAMO


    Posts : 7514
    Points : 7604
    Join date : 2014-11-25

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  ALAMO Wed Dec 22, 2021 9:51 am

    George1 wrote:
    On Monday, December 20, Severnaya Verf issued a press release , in which it stated:

    “On the weekend after the completion of the fire extinguishing work on the " Provorny " corvette , the Severnaya Verf specialists carried out its initial inspection. The factory services preliminarily established that, thanks to the mounted fire insulation between the superstructure and the deck, the ship's hull was not damaged. The superstructure must be dismantled. There was no equipment in the superstructure. Negotiations are underway with JSC SNSZ on the construction of a new superstructure.

    To prevent freezing of the water that got into the hold during the extinguishing of the fire, heating and electricity were ordered on Saturday and Sunday, about 100 workers provided the pumping of water and drying the surfaces. They also cleaned the premises from the effects of the fire.

    To assess the damage, a commission was created from representatives of the plant and the USC, and it started to work. It is too early to talk about the causes of the fire. It will take several weeks for an authorized commission to investigate the circumstances and determine the cause ”[end of release].

    Later, an unofficial source at Severnaya Verf estimated the cost of damage from the fire at 22 billion rubles.


    https://bmpd.livejournal.com/4451364.html

    That makes 260+ mln euro, $300 mln, making this news utterly bullshit. The whole corvette costs less than double.

    flamming_python, PapaDragon, LMFS, Hole and lancelot like this post

    avatar
    mnztr


    Posts : 2898
    Points : 2936
    Join date : 2018-01-21

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  mnztr Thu Dec 23, 2021 3:02 am

    Surprised that the superstructure burns so readily. I thought they would have developed a composite that is less flammable I cannot imagine how it would deal with being struck even with 30mm cannon. That would burn like crazy.
    Arkanghelsk
    Arkanghelsk


    Posts : 3909
    Points : 3915
    Join date : 2021-12-08

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Arkanghelsk Thu Dec 23, 2021 3:51 am

    Typically ships have a fire suppression system on board like halon or other systems. But obviously this is only possible to work if the ships auxiliary systems are installed.

    In any case, any and all ships will burn like this , see USS bonhomme, french rubis submarine, or type 075 LHD.

    Many factors will affect fire safety and every case can be different, but any ship can catch fire and be lost if there is no protocol or if the crew/workers are not present to contain this

    GarryB and owais.usmani like this post

    PapaDragon
    PapaDragon


    Posts : 13472
    Points : 13512
    Join date : 2015-04-26
    Location : Fort Evil, Serbia

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  PapaDragon Thu Dec 23, 2021 8:44 pm


    Some good news for a change (if true) thumbsup

    Source: shipbuilding contracts will be redistributed after fire on Provorny (to Amur and Yantar)

    https://tass.ru/armiya-i-opk/13278195


    Hopefully this get extended to Gorshkov-class a well

    Maximmmm, LMFS, owais.usmani and Arkanghelsk like this post

    Arkanghelsk
    Arkanghelsk


    Posts : 3909
    Points : 3915
    Join date : 2021-12-08

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Arkanghelsk Thu Dec 23, 2021 9:05 pm

    I do believe 20385 rest of the ships were contracted for Amur anyway, this was the last ship at severnaya

    PapaDragon
    PapaDragon


    Posts : 13472
    Points : 13512
    Join date : 2015-04-26
    Location : Fort Evil, Serbia

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  PapaDragon Sat Dec 25, 2021 4:07 pm

    Arkanghelsk wrote:I do believe 20385 rest of the ships were contracted for Amur anyway, this was the last ship at severnaya

    After this fuckup it definitely is


    ALSO:


    Video of Aldar looking dope as fuuuck:

    GarryB, franco, medo, George1 and Big_Gazza like this post

    Hole
    Hole


    Posts : 11121
    Points : 11099
    Join date : 2018-03-24
    Age : 48
    Location : Scholzistan

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Hole Sat Dec 25, 2021 6:06 pm

    Project 20380(5): Steregushchy Corvette #2 - Page 13 014010
    Project 20380(5): Steregushchy Corvette #2 - Page 13 014211
    Project 20380(5): Steregushchy Corvette #2 - Page 13 014311

    GarryB, franco, medo, George1 and Big_Gazza like this post

    George1
    George1


    Posts : 18521
    Points : 19026
    Join date : 2011-12-22
    Location : Greece

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  George1 Mon Dec 27, 2021 10:46 am

    Russian Navy corvette Provorny may be restored in five years after shipyard fire — source

    https://tass.com/defense/1381131

    LMFS likes this post

    avatar
    calripson


    Posts : 753
    Points : 808
    Join date : 2013-10-26

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Just Write It Off

    Post  calripson Mon Dec 27, 2021 9:47 pm

    George1 wrote:Russian Navy corvette Provorny may be restored in five years after shipyard fire — source

    https://tass.com/defense/1381131

    You could lay a new keel and have a complete ship in less time.

    Rasisuki Nebia likes this post

    kvs
    kvs


    Posts : 15857
    Points : 15992
    Join date : 2014-09-11
    Location : Turdope's Kanada

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  kvs Mon Dec 27, 2021 9:50 pm

    calripson wrote:
    George1 wrote:Russian Navy corvette Provorny may be restored in five years after shipyard fire — source

    https://tass.com/defense/1381131

    You could lay a new keel and have a complete ship in less time.

    Which suggests that such news reports are fluff. We do not know the real schedule.

    LMFS and Rasisuki Nebia like this post

    PapaDragon dislikes this post

    Krepost
    Krepost


    Posts : 786
    Points : 788
    Join date : 2021-12-07

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Krepost Mon Dec 27, 2021 10:42 pm

    The 5 year timeline may actually be a correct estimation for the ship's delivery.
    It does not mean that the factory will actually work constantly for 5 years until the ship is ready. No, nothing like that.

    This is how I understand it:
    - About one year to make all the damage assessment, debris removal and repair estimations + contracting
    - About 2 years of wait time where no work is done on the ship until the new composite superstructure is built by the contractor. During this time the hull will be placed in the water again only to be brought back to the yard when they are going to install the new superstructure.
    - About 2 years 2 finish the ship. This is the actual work time.
    Isos
    Isos


    Posts : 11602
    Points : 11570
    Join date : 2015-11-06

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Isos Mon Dec 27, 2021 11:27 pm

    That structure can be done in matter of few months. Everything else is already ready. I bet 1 year delay.

    GarryB and Arkanghelsk like this post

    avatar
    mnztr


    Posts : 2898
    Points : 2936
    Join date : 2018-01-21

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  mnztr Tue Dec 28, 2021 7:54 pm

    PapaDragon wrote:

    Video of Aldar looking dope as fuuuck:

    Russia designs some really sharp looking warships. The curren gen are really nice looking ships. I also like the shade of grey they use. Its slightly blue. The proportions are right and the BFG on the front means business!!!
    Krepost
    Krepost


    Posts : 786
    Points : 788
    Join date : 2021-12-07

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Krepost Tue Jan 04, 2022 12:33 am

    Gromky in the Pacific.
    Project 20380(5): Steregushchy Corvette #2 - Page 13 03-10310

    GarryB and George1 like this post

    Podlodka77
    Podlodka77


    Posts : 2589
    Points : 2591
    Join date : 2022-01-06
    Location : Z

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Podlodka77 Sun Jan 09, 2022 5:10 pm

    Москва. 9 января. INTERFAX.RU - Начало ходовых испытаний корвета "Резкий" запланировано на конец января, сообщили в воскресенье в пресс-службе Тихоокеанского флота.

    Corvette Rezkiy will be send to her first sea trials which are planed for the end of this month. That news was published by press office of Russian Pacific fleet.

    I will add this picture of Rezkiy corvette in Vladivostok from november 2021 Project 20380(5): Steregushchy Corvette #2 - Page 13 Image-10

    GarryB, medo, Big_Gazza and kvs like this post

    Krepost
    Krepost


    Posts : 786
    Points : 788
    Join date : 2021-12-07

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Krepost Sat Jan 15, 2022 3:13 am

    Today, Gremyashy did her first sortie from Vladivostok since it was deployed there.
    Photo is from today.

    Project 20380(5): Steregushchy Corvette #2 - Page 13 15-10310

    franco, George1, kvs, DerWolf, zardof, Hole, lancelot and Podlodka77 like this post

    Krepost
    Krepost


    Posts : 786
    Points : 788
    Join date : 2021-12-07

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Krepost Wed Feb 16, 2022 7:40 pm

    Gremyashi and Aldar Long Name
    Project 20380(5): Steregushchy Corvette #2 - Page 13 16-10414
    Project 20380(5): Steregushchy Corvette #2 - Page 13 16-10413

    GarryB, George1, flamming_python, magnumcromagnon, kvs, hoom, Hole and like this post

    Hole
    Hole


    Posts : 11121
    Points : 11099
    Join date : 2018-03-24
    Age : 48
    Location : Scholzistan

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Hole Sat Mar 12, 2022 10:25 am

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Fnmisg10
    9M100 on board Soobrazitelny.

    GarryB, magnumcromagnon, Big_Gazza, kvs and Arkanghelsk like this post

    GarryB
    GarryB


    Posts : 40541
    Points : 41041
    Join date : 2010-03-30
    Location : New Zealand

    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  GarryB Sun Mar 13, 2022 2:03 am

    Looks like a screen grab from a video... any idea where that video might be?

    The triangular support struts and the shaping of the under hatch upper surface seem optimised specifically for this missile.

    Is it Redut or a new specialist launcher hatch just for 9M100?

    That is what I envisioned the Redut would look like with four 9M96 tubes, those tubes appear to be rather large calibre for the hatch area.

    Sponsored content


    Project 20380(5): Steregushchy Corvette #2 - Page 13 Empty Re: Project 20380(5): Steregushchy Corvette #2

    Post  Sponsored content


      Current date/time is Thu Nov 21, 2024 8:27 pm